Project Information Websites

The following are current websites for ongoing land development, environmental engineering and technology implementation projects:

Client Testimonials

Township of Essa

RE: Township of Essa Engineering Services
 
On behalf of the Township of Essa (Township), I would like to acknowledge Greenland for its exemplary services to complete the 2022 Community of Angus Infrastructure Master Plan (IMP) Class Environmental Assessment (EA). This legacy Township document developed municipal water and wastewater system models. These calibrated tools were then used by Greenland to develop a sustainable infrastructure planning framework for water and wastewater servicing expansion requirements within the Community of Angus. The project was completed “on-budget and on-time” and cognizant of environmental, technical and socio-economic constraints and opportunities affecting the Township of Essa.

We also appreciate your team’s expertise to provide subsequent model-keeper and development peer review support services. These important responsibilities and overseen by Township staff will help ensure new development approvals proceed in a manner which is consistent with the infrastructure management and expansion needs established by the completed IMP EA project.

Finally, we recognize the professional credentials and attention to detail involvement by your assigned team led by Mr. Josh Maitland, P. Eng.

We look forward to working with Greenland on other projects and serving as a professional reference.
 
Michael Mikael, P.Eng
Manager of Public Works/Deputy CAO
Township of Essa
October 18, 2023
 

Town of Collingwood

On behalf of the Town of Collingwood, I would like to thank the Greenland Group of Companies for their design and execution of the Town’s vision for Heritage Park, coordination of all consultants, contract administration and construction inspection.

Greenland always strives for thoroughness, professionalism and addressing their clients needs on each of their projects – this was no exception.

Peter G. Dunbar
Director, Leisure Services
Town of Collingwood

August 30, 2010
 

University of Guelph

The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.

The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.

Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph

January, 26 2015
 

Corporate Partnerships & Associations

Partnerships and Accreditations